Build velocity · Public record
What we’ve shipped, what’s in flight.
ASOLOOPis in production and shipping weekly. This page is the honest record — what landed, what’s in flight, and what’s on the roadmap with a clear status flag so you can see exactly where each commitment stands.
20 shipped
2 in flight
2 on the roadmap
2026-07-19
·Marketing
LiveSite refresh: clearer pricing, comparisons, and multi-market messaging
Rebuilt the marketing site's pricing page, comparison pages, and homepage around the loop ASOLOOP actually runs — propose, generate, launch, apply the winning variant, and report it in revenue, across both stores and in your listing's own storefront language.
2026-07-12
·Frontend
LiveSignal sources now list every import, with one-click rescrape or revoke
Evidence → Signal sources shows every import per source with signal counts and last-updated times. Rescrape any source on demand, or revoke an import within a 7-day undo window — the same reversibility guarantee that covers every other signal.
2026-06-29
·Algorithm
LiveEvery hypothesis now comes with an instant preview before you commit
Every hypothesis candidate — in the pool, on a recommendation card, or during onboarding — renders an automatic preview (one copy variant, one draft image) so you can judge the idea before generating the full creative set. Approve to produce the real variant with full editing control, or request a correction in your own words.
2026-06-24
·Algorithm
LiveOperator-approved winners: Approve or Reject before a result goes live
When an experiment finishes with a winning variant, it lands in a Pending review queue instead of applying automatically — unless you've turned on auto-apply for that app. Review the result and Approve or Reject before it ships to your live listing.
2026-06-20
·Backend
LiveHardened workspace data isolation across the API
Extended the workspace-boundary checks that already protect experiment and app data to every remaining API endpoint, closing a class of cross-workspace access gaps. No customer action needed.
2026-06-16
·Frontend
LiveEvidence, reorganized: one home for signals, hypotheses, and sources
The Learnings section is now Evidence, with signals, hypotheses, the brief, and signal sources under one consistent home. Old bookmarks and links still work — they redirect automatically.
2026-06-02
·Algorithm
LiveF5Why-this dialogue — Agent-mode interrogation
Interrogate any Agent-mode recommendation: see the signals, their weights, and the alternatives ranked underneath the top candidate — every answer traceable to its source. Algorithm, router, and the in-product dialogue surface are live; the reasoning layer is fully shipped.
2026-06-02
·Connectors
LiveF4Four live MMP connectors — AppsFlyer, Adjust, Branch, Firebase Analytics
Connect and cohort sync are live across all four MMPs, at the same precision discipline. Revenue denomination reads from AppsFlyer today — a workspace-level revenue band computed from your connected AppsFlyer revenue, never a point estimate. Translating Bayesian CVR posteriors into expected revenue ranges via your real ARPU, install-to-paid rate, and lifespan, and wiring the Adjust, Branch, and Firebase revenue paths, is in progress. Connect the one you already have.
2026-05-09
·Marketing
LiveMKT-PAGE-LEGAL-TRUST + MKT-PAGE-DESIGN-PARTNERSWebsite page-surface expansion: Phase 1 + Phase 2
Shipped /terms, /security, /dpa, /design-partners. Stripe-procurement-readiness signal active; Teams procurement DPA-availability surfaced; Technical Influencer security-review path live; GTM Channel-1 + Channel-4 outreach now has a canonical landing URL.
2026-05-09
·Attribution
LiveENG-LAUNCH-ATTRIBUTIONLaunch attribution end-to-end
UTM capture on the marketing site, signup-payload ingestion on the product app, channel-rule registry, and an operator dashboard at /admin/attribution. Per-piece organic-content trial-signup attribution live.
2026-05-09
·Marketing
LiveMKT-CONTENT-PHASE-1 + MKT-OPS-LANDING-COPY-REFRESHWeek 20-21 blog batch + landing-page copy refresh
Four blog posts shipped (App-Specific hub, Reversibility hub, Memory spoke, MobileAction comparison) closing the six-pillar hub set and the top-3 incumbent comparison set. Landing-page surface rebuilt for production quality with ICP-routing section between Stats and CTA banner.
2026-05-08
·Billing
LiveENG-BILLING-STRIPEStripe billing foundation
Customer / Subscription / WorkspaceAddon ORM + 8 HTTP endpoints + entitlements + webhooks + dunning + Settings → Billing UI panel + TrialBanner wire-in + per-app-quantity verify scripts.
2026-05-08
·Brand
LiveMKT-BRAND-V1.1-EXPANSION (Part A)Brand guidelines v1.1 + globals.css alignment
BRANDING.md patched v1.0 → v1.1 with extended color tokens (Primary Soft, Primary Dark, Ink 2, Surface Alt, Divider Soft), refined opacity rule, typography scale, spacing scale, component patterns, and quantified logo clear-space. globals.css aligned with inline section comments.
2026-05-08
·Marketing
LiveMKT-WEBSITE-ADOPT + MKT-CONTENT-PHASE-1Production-stage flip + indexing enabled
Site stage flipped from design-partner → production. NEXT_PUBLIC_ALLOW_INDEXING=true by default. /pricing promoted to primary nav. All trial CTAs live across the site. Initial campaign catalog (4 TOFU pillar hubs + 2 MOFU comparisons) shipped.
2026-05-08
·Marketing
LiveMKT-PRICING-PAGE-COPYPricing page + tier comparison + AI-Model section
/pricing route shipped with 3-tier comparison table (Starter / Pro / Teams), monthly/annual toggle, Connect Your AI Model section, stack-fit comparison (additive-not-replacement), 10-question FAQ. Connect-Your-AI-Model adopted as the universal label across all tiers.
2026-05-08
·Frontend
LiveR7R7 frontend wire-in
HOLISTIC prop swap + DecompositionEditor surface — operator-editable rule decomposition for the recommendation pipeline.
2026-05-08
·Algorithm
LiveR1aR1a Experiment entity migration
Algorithm-layer Experiment entity migration shipped. R1b App entity migration deferred pending downstream coordination.
2026-05-07
·Frontend
LivePer-row provenance chip + diagnostic tooltip polish
Ranking surface: every recommendation row now carries a per-row provenance chip showing which signals contributed and at what weight. Diagnostic tooltip polish on /recommendations.
2026-05-07
·Frontend
Livestream_b_merged_count diagnostic on /recommendations
Surfaces the count of secondary-stream signals merged into the primary recommendation stream — observability for cycle-program iteration debugging.
2026-05-07
·Programs
In progressR12R12 cycle program iteration: algorithm + worker
Cycle-program iteration loop landed at the algorithm and worker layers. Each iteration writes contribution to the per-app evidence library; the next iteration starts from accumulated signals. UI variant selector outstanding.
2026-05-07
·Programs
In progressR14R14 Programs UI scaffold
/programs SPA route + ExperimentSchedule entity scaffolded; cadence selectors (daily / weekly / biweekly / monthly / quarterly); per-program evidence-summary card.
2026-05-06
·Algorithm
Livetesting_appetite consumer migration to confidence_setting
Consumer surface deprecated per Direction #19; migration path to confidence_setting documented in PROMPT artifact.
Roadmap
·Algorithm
RoadmapF1F1 Industry Pattern Library
Industry-specific pattern library (Source 8) carrying compounding per-app evidence proof — Pro+. Read-path + Source 8 worker remaining (ROADMAP C3).
Roadmap
·Backend
RoadmapPROD-PRICING-D-4Multi-region data residency at Teams
EU and APAC residency regions. Teams tier; V1.1 Wave 6.
What this page is not
A vanity feed. We list shipped work, in-flight work, and roadmap items equally so you can see the actual cadence. Roadmap items carry no date because we don’t commit to dates we can’t hit; status flips to in progress when active development starts and live when the closing commit lands on main.
See also Security for compliance roadmap status, Pricing for tier-feature roadmap, and How it works for the architectural commitments behind the shipped work.